top of page
KION
Location
Ostrov u Stříbra
Year
2022-2023
Profit
13 mil. CZK
For the KION company in Ostrov u Stříbra, we carried out construction modifications of the production hall for the installation of a new painting line.
As part of construction improvements, we implement excavation work, waterproofing, reinforcement, concreting with waterproof concrete, antistatic floors. I also installed gas distribution, HT, electrical installation (weak/strong), SHZ modifications, EPS modifications. Installation of new sectional doors including steel structure and plumbing elements. Penetrations through the roof including OK replacements and waterproofing. Everything in operation.
bottom of page